Can someone please explain how WDS gets involved in these projects ?
An article posted on the internet says
"BG will now issue final notices to proceed to the main contractors appointed for the development of the first phase of QCLNG, including: Bechtel for the engineering, procurement and construction of the liquefaction plant; WorleyParsons for gas field facilities and infrastructure development; and MCJV, a joint venture between McConnell Dowell and Consolidated Contractors Company, for the transmission pipeline network."
McConnell Dowell is a company that creates the pipework . Does this mean that WDS doesn't get much work with BG ? I understand they could be sub contracted by WorleyParsons to do some work , but the cream for WDS would be to build the 500km+ of pipelines - and this is going else where . Can someone give some insight into how it works ?
- Forums
- ASX - By Stock
- WDS
- how does it work ?
how does it work ?
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WDS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$25.36 |
Change
0.310(1.24%) |
Mkt cap ! $46.70B |
Open | High | Low | Value | Volume |
$25.14 | $25.50 | $25.11 | $207.5M | 8.180M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3198 | $25.35 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$25.36 | 140846 | 6 |
Last trade - 16.10pm 25/11/2024 (20 minute delay) ? |
Featured News
WDS (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online