Can someone please explain how WDS gets involved in these projects ?
An article posted on the internet says
"BG will now issue final notices to proceed to the main contractors appointed for the development of the first phase of QCLNG, including: Bechtel for the engineering, procurement and construction of the liquefaction plant; WorleyParsons for gas field facilities and infrastructure development; and MCJV, a joint venture between McConnell Dowell and Consolidated Contractors Company, for the transmission pipeline network."
McConnell Dowell is a company that creates the pipework . Does this mean that WDS doesn't get much work with BG ? I understand they could be sub contracted by WorleyParsons to do some work , but the cream for WDS would be to build the 500km+ of pipelines - and this is going else where . Can someone give some insight into how it works ?
- Forums
- ASX - By Stock
- WDS
- how does it work ?
how does it work ?
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WDS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$25.07 |
Change
0.560(2.28%) |
Mkt cap ! $46.70B |
Open | High | Low | Value | Volume |
$24.86 | $25.13 | $24.83 | $65.20M | 2.521M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 1515 | $25.06 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$25.07 | 1182 | 12 |
Last trade - 11.19am 22/11/2024 (20 minute delay) ? |
Featured News
WDS (ASX) Chart |