NML 0.00% 10.0¢ navarre minerals limited

Holes 5 and 6, page-2

  1. 415 Posts.
    lightbulb Created with Sketch. 17
    Interesting initial results from CYL in their quarterly released Friday. This was not mentioned in our quarterly. I think this may be an update of their announcement of 21/4/17.

    VERY HIGH GRADE GOLD INTERSECTIONS CONTINUE TO UPGRADE THE POTENTIAL OF BOYD’S DAM/BOYD NORTH AT FOUR EAGLES GOLD PROJECT • Very high grade gold mineralisation (1.0 metre @ 247g/t Au) intersected at Boyd’s Dam • Gold mineralisation confirmed over 1.8 kilometres at Boyd’s Dam/Boyd North • Visible gold in association with quartz and arsenopyrite recorded during drill rig sampling • Hayanmi RC Drilling and Gravity Reconnaissance Air Core drilling in progress • Bulk Leach confirmation assays still awaited • Major new shareholder St Barbara Limited (SBM) site visit ____________________________________________________________________________________ Catalyst Metals Limited (Catalyst or the Company) (ASX: CYL) advises that assays received from the Boyd’s Dam and Boyd North Prospects at the Four Eagles Gold Project have shown the highest gold grades received to date. Within a six-metre intersection in FERC152 at Boyd’s Dam that assayed 50.4g/t Au, a one-metre interval assayed 247g/t Au. Ten holes contained intersections greater than 20 gram metres and confirm that the structure has good gold grades throughout the 1.8 kilometre strike length. Catalyst’s 2017 drilling programme is still in progress with two drill rigs currently working on the Tandarra Gold Project located about 15 kilometres to the south. The Four Eagles Gold Project drilling will resume after the completion of the Tandarra Gold Project drilling programme. This announcement only covers results that have been received for most of the RC Blade/Hammer programme at Boyd’s Dam and also the Air Core programme at Boyd North and a northern section at Hayanmi. Assay results are still outstanding for RC Blade follow up drilling at Boyd North and for the major drilling programme at Hayanmi. Further announcements will be reported in the coming month as sufficient assay resultss are received from a project area to provide meaningful interpretation.
 
watchlist Created with Sketch. Add NML (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.