Working as at hole 11DF12 with 125m each side of hole drilled, midway to the next hole or 125m to an outage area.
Resource at hole 11DF06.(drilled by Teck Resources)
Zinc 19.15%, lead 4.9% and silver 83ppm and seam thickness = 0.85m.
zinc resource 125m x 125m x 0.85m interval (seam thickness)x 7.135 tonnes per cubic metre x 19.15% = 18,146 tonnes of zinc.
Lead resource 125m x 125m x 0.85m x 11.34 x 4.9% = 7,379 tonnes of leadf.
Silver 125m x 125m x0.85m x 10.49 x 83 divided by 1 million = 11.56 tonnes of silver.
Total resources guessed at hole 11DF06 = 2553.4 tonnes.
@@@
Resource at hole 11Df05 drilled by Teck.
zinc resource 125m x 125m x 0.3m x 7.135 x 8.62% = 2,882 tonnes of zinc.
Lead resource 125m x 125m x 0.3m x 11.34 x 0.41% = 217 tonnes of lead.
Silver approx = 0.408 tonne of silver.
@@@
Resource at hole 11DF07 drilled by Teck.
zinc low approx = 557 tonnes. Lead at 18,604 tonnes.
silver at 1.3 tonnes.
@@@
Resource at hole 11DF04 drilled by Teck.. zinc at 3,827 tonnes. Lead at 45 tonnes. Silver at 1.076 tonnes.
@@@
-