Fair enough @gosouth.
The good news here is that the margin for error is very wide.
Given my assumptions (conservative), NSR per tonne should be in the US$500 range. Site costs for underground mining should be no more than US$80/t (and likely much less). Again, the resource looks amenable to open pit mining with site costs no more than US$20/t. Even if just one of the 3-4 cons are marketable, Rupice should be a highly profitable operation.
- Forums
- ASX - By Stock
- Historic Holes
Fair enough @gosouth. The good news here is that the margin for...
-
-
- There are more pages in this discussion • 41 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ADT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.10 |
Change
-0.100(2.38%) |
Mkt cap ! $918.1M |
Open | High | Low | Value | Volume |
$4.15 | $4.18 | $4.05 | $2.359M | 574.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | $4.07 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.20 | 5541 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1197 | 0.835 |
1 | 5000 | 0.815 |
3 | 9950 | 0.810 |
2 | 21000 | 0.805 |
6 | 46713 | 0.800 |
Price($) | Vol. | No. |
---|---|---|
0.840 | 40000 | 1 |
0.850 | 14746 | 1 |
0.860 | 9795 | 2 |
0.875 | 9168 | 2 |
0.880 | 17293 | 2 |
Last trade - 16.10pm 26/11/2024 (20 minute delay) ? |
ADT (ASX) Chart |