I guess the 3 tanks completed will be put into use asap, then run the bottling lines more hours and production should start to increase. I don't think they have to wait for the last piece of equipment to be installed before production can be increased. Not sure of the cycle time of a brew, but you can assume that the bottling plant can out run the brewing tanks.