JV SMD30%-KMN70%
SMD CHEAP ENTRY
Kalman early driling has seen:
73m @ 0.62% MoS2 Eq
329m @ 0.31% MoS2 Eq
and mineralisation starts within 20 metres of surface
The last results out after the close yesty include:
43m @ 0.27% MoS2 from 200m in K-56
53m @ 0.61% MoS2 from 255m in K-58
16m @ 0.31% MoS2 from 191m in K-59
24m @ 0.24% MoS2 from 239m in K-61