PGS 0.00% 0.0¢ planet gas limited

hey guys.., page-2

  1. Ya
    5,477 Posts.
    lightbulb Created with Sketch. 1040
    SS#1 reached a TD of 3770m (which is 10m short of the prognosed 3780m).

    Anyway the Protocol is to:

    - run wireline logs,
    - identify the gross & net pay, porosity, permeability etc.
    - decide the next plan of action

    Should they opt to proceed with a lateral then,
    - they'll set a Plug,
    - choose a kick-off depth for the lateral section (Well name will change to incorporate the Deviation well)
    - then start sliding ahead

    Hope they provide more clarity post-Logging.

    SS#1 is 5 kms north from Beanbush#1 where a DST in the Patchawarra flowed 1.5 MMcfd gas. So from a well control point of view they have two wells near SS#1, ie BB#1 & Moondie-1. Permeability is the key at SS#1 within the Toolachee or Patchawarra Formations.

    Hope this helps.
 
watchlist Created with Sketch. Add PGS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.