TSL 25.0% 0.5¢ titanium sands limited

have i missed something, page-5

  1. 1,157 Posts.
    your quote:
    one thing we've all missed is the mining start-up.
    Answer:
    A load of garbage.
    Windimurra Construction on Schedule for Completion in Q4 2008 16 July 2008.

    your quote:
    they raised $25m to bring mining forward 3 months, and start mining in september.
    Answer:
    Correct.But small delays are inevitable,but they remain within key budget parameters.

    your quote:
    bgc were to supply mining services. previous job adverts by bgc showed windimurra as a client, advert at weekend in west australian didn't show them as a client. suppose bgc has pulled out because they don't want the risk of a new project. wvl would have to buy a small fleet and mine it themselves.
    Answer:
    BGC Current Projects-Windimurra - Mining
    Business Unit Mining Projects
    Client Midwest Vanadium Pty Ltd
    Scope The Windimurra Vanadium operation is an open pit operation. The major items of work to be provided by BGC Contracting include: Load & Haul, Drill & Blast, Crusher Feed and Wet/Dry Tails removal. (Est Value: $100.0 million)
    Complete September 2011(estimated)
    http://www.bgc.cc/location/Current-Projects

    your quote:
    like i say - announcement through this tricky time would at least help us decide whether it's worth holding shares much longer. we've waited long enough for a return.
    Solution:
    Please feel free to buy any other stock.
    Don't waste your valuable time.
    Good luck with what ever stock you decide to hold.
 
watchlist Created with Sketch. Add TSL (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.001(25.0%)
Mkt cap ! $8.846M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $221 44.2K

Buyers (Bids)

No. Vol. Price($)
7 7559369 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 2864318 4
View Market Depth
Last trade - 10.08am 29/11/2024 (20 minute delay) ?
TSL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.