Dont expect results until Monday-the BOP maintenance will slow the drilling down by a day or so. Arwon is being led slowly to the barrier! On another rumour, think we can expect Derrilyn to come onstream in the next two weeks. It flowed up to 4500 bbls a day, however the rate down the pipeline (yes pipeline!-not trucks) will be about 2000bbls a day. STU has 35%= 700bbls-all going down the tubes at around A$70 bbl on current prices, vrs costs of around A$20bbl! Go you good thing. Cheers,TAS
STU Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held