MHL 0.00% 0.3¢ monitor energy limited

VPE drilling in Growler has been delayed along with oil...

  1. 791 Posts.
    lightbulb Created with Sketch. 178
    VPE drilling in Growler has been delayed along with oil production which needs to be trucked - due to heavy rain and flooded creeks.

    All activity including the VPE/MHL well testing will have been delayed due to lack of access.

    Trying to predict the weather and when operations will return to normal is always a guess but I would expect they will be back at it a week or so after the rain stops (after all it is a desert).

    Wireline perforation and testing usually takes 2-5 days per zone.
 
watchlist Created with Sketch. Add MHL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.