    VPE drilling in Growler has been delayed along with oil production which needs to be trucked - due to heavy rain and flooded creeks.

    All activity including the VPE/MHL well testing will have been delayed due to lack of access.

    Trying to predict the weather and when operations will return to normal is always a guess but I would expect they will be back at it a week or so after the rain stops (after all it is a desert).

    Wireline perforation and testing usually takes 2-5 days per zone.
 