sodic Monday, September 9, 2013 - 14:55 pm Groundbreaking November pig iron plant illustration / ist
Sindonews.com - The process of acquisition of land to build a pig iron plant by PT Jogja Magasa Iron (JMI) continues. Today JMI acquired 51 plots of land for the third phase.
Because, when the follow-up process smoothly, laying the first stone of the factory is done according to plan, which is 3 November 2013.
Secretary of Kulon Progo, RM Astungkoro said, local government continues to monitor the process of land acquisition by JMI. Monitoring needs to be done because JMI as the holder of the contract work must map the existing land, is it enough to build a factory or not.
"If it reaches a whole 225 hectares of land required. But it was a gradual development.'s Why we keep watching, whether it is enough or not. Laying of the first stone so can plan accordingly," said Astungkoro, Monday (09/09/2013).
Meanwhile, the related statements of Land Coastal Farmers Association (PPLP) that the results of a relatively small iron sand, Astungkoro said, the percentage of the iron sand mining results determined the central government. So that the area can not be rejected even though the percentage is relatively small.
While the compensation related to the community, JMI has prepared a variety of programs that will help improve the life of the surrounding community. "The program is not it a lot. Among them have been delivered by the JMI," he said. Google Übersetzer für Unternehmen:Translator ToolkitWebsite-ÜbersetzerGlobal Market Finder
IDO Price at posting:
6.0¢ Sentiment: ST Buy Disclosure: Held