@TMacker - I am just trying to understand the answer to Question 4
4. Clarity around how under contracts are progressing and if any intention to ramp up conversions:
- We have removed the “under contract” from our guidance for two reasons, one: it created confusion as to revenue generating volume and sometime volume, two: With the sheer volume of sales and broad variation in site volumes it was not an accurate measure in energy Volume (MWh or GWh). Our delivery time still remains at circa 16-20weeks, yet some sites may be 300MWh and some 3GWh, having disseminate this in start to finish is far too difficult to line up.
Was the question really answered? He talked about what was under contract, conversion periods, guidance and hasnt really responded to the question of ramp up conversion.
It is a query that has been asked of him by a couple of posters who have got differing responses. Do they have intention to ramp up conversions?
Just want to check I am not missing something or interpreting incorrectly.
- Forums
- ASX - By Stock
- Green today
@TMacker - I am just trying to understand the answer to Question...
-
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LPE (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.5¢ |
Change
0.005(3.33%) |
Mkt cap ! $23.42M |
Open | High | Low | Value | Volume |
15.5¢ | 15.5¢ | 15.5¢ | $15.5K | 100K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 272931 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.5¢ | 81644 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 45374 | 0.125 |
3 | 478413 | 0.120 |
2 | 484782 | 0.115 |
4 | 693732 | 0.110 |
1 | 50000 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 448144 | 6 |
0.135 | 450000 | 3 |
0.140 | 470000 | 3 |
0.150 | 8000 | 1 |
0.160 | 59490 | 2 |
Last trade - 10.37am 04/12/2024 (20 minute delay) ? |
Featured News
LPE (ASX) Chart |