ULEY GRAPHITE PROJECT
EBR 100 % DILUTING TO 25 % FREE CARRIED TO PRODUCTION
PORT LINCOLN SOUTH AUSTRALIA
The farminee `Mikkira Graphite P/L' (MG) has paid A$200,000 to EBR to extend its option
on the project a further 18 months to enable MG to continue testing and due diligence. On
exercise of the option MG has the present intention to construct at their sole cost a plant to
achieve `mechanical beneficiation...with an output capacity of approximately 83,000 tonnes
per annum (TPA)... at a carbon content of 60-90 % carbon.'
The previous farminee spent some A $15 million to commission the existing plant at 14,000
TPA at a grade of + 94 % which may be demolished or significantly upsized to achieve MG's
targeted output capacity of 83,000 TPA at 60-90 % carbon.
regards The Tinhopper
- Forums
- ASX - By Stock
- graphite
ULEY GRAPHITE PROJECT EBR 100 % DILUTING TO 25 % FREE CARRIED...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EBR (ASX) to my watchlist
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online