And for (F)
Design and Engineering:
The design and engineering work on the industrial scale in-field pilot plant is being progressed by Hatch Engineering and Lilac Solutions. This includes further test work by Lilac to test part of the plant intended to be used in-field to confirm the design prior to progressing to procurement and construction and to validate the design being engineered. This equipment is larger than the bench top laboratory scale equipment previously used to perform the test work.
Once this is completed/confirmed we will be valued at what we are worth IMO........I’m confident that BBB is confident that it will happen- and that will do me - just have to be patient.
- Forums
- ASX - By Stock
- Good old fireside chat
And for (F) Design and Engineering:The design and engineering...
-
- There are more pages in this discussion • 441 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $113.7M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.5¢ | $98.28K | 1.471M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 7000 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 188682 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 78748 | 0.090 |
2 | 65436 | 0.089 |
4 | 302344 | 0.088 |
4 | 322102 | 0.087 |
3 | 371806 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 21430 | 2 |
0.095 | 12600 | 1 |
0.096 | 98635 | 5 |
0.097 | 89032 | 3 |
0.098 | 145000 | 1 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
ASN (ASX) Chart |