Share
343 Posts.
lightbulb Created with Sketch. 122
clock Created with Sketch.
08/03/19
01:32
Share
Originally posted by speedyl:
↑
Yeh I agree, I'm happy and think that it makes sense for them to move the same drill rig over to LC2 after completing at Skyline as everyone will still be there and it was probably quite a quick change over as no need for the rig to drive back to base at Moab etc. The trail to LC2 is also just down the road whereas its a bit of a drive back to Moab and then would need to re-mobilise a few days later. Having said that, if RJ is right though I am very disappointed that we didnt get an ASX announcement about firstly moving the drill rig to LC2 and secondly that they had commenced drilling there. Even the twitter updates at a minimum would have been good so if it is true it was another missed opportunity there IMO by Bruce to keep the info flow continuing while there was interest from the Skyline drills. Guess we will see in the next few days hopefully.
Expand
Would they have an idea on the ppm from on site testing of the first hole? Im struggling to think of a positive reason drilling commencement with no announcement - I’d love to hear one?