The last drilling Ann was 27/2 having sampled c31 at 6220ft, c33 has not been sampled.
But that still leaves c17, c19, and c29 is the sampling finished and at the lab?
Have the earthworks been carried out at Long Canyon?
Is this Rig going to be used at Long Canyon? If so wouldn't do to have it sitting idle.
- Forums
- ASX - By Stock
- Good old fireside chat
The last drilling Ann was 27/2 having sampled c31 at 6220ft, c33...
-
- There are more pages in this discussion • 628 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.1¢ |
Change
-0.003(4.69%) |
Mkt cap ! $113.7M |
Open | High | Low | Value | Volume |
6.4¢ | 6.4¢ | 6.0¢ | $169.3K | 2.749M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.3¢ | 40000 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 78748 | 0.090 |
2 | 65436 | 0.089 |
4 | 302344 | 0.088 |
4 | 322102 | 0.087 |
3 | 371806 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 21430 | 2 |
0.095 | 12600 | 1 |
0.096 | 98635 | 5 |
0.097 | 89032 | 3 |
0.098 | 145000 | 1 |
Last trade - 16.10pm 02/12/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |