I think production will happen with some wells free flowing and the main well being pumped to keep the processing volume to what is needed.
3 to 4 wells feeding tanks and holding ponds under there own pressure would create pumping cost savings with at least one having a pump connected for when more volume is needed.
Initially the pilot plant may not need for the wells to be pumped until higher processing happens in latter years.
It is hard to say how a pump or pumps will operate ,as some zones will need to be pumped if they are to be included in regards to mainly B Br I and Mg.
Overall there will be huge pumping savings ,regardless of how the brine is collected from the brine zones.
- Forums
- ASX - By Stock
- Good old fireside chat
I think production will happen with some wells free flowing and...
-
-
- There are more pages in this discussion • 704 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.1¢ |
Change
-0.003(4.69%) |
Mkt cap ! $113.7M |
Open | High | Low | Value | Volume |
6.4¢ | 6.4¢ | 6.0¢ | $169.3K | 2.749M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.3¢ | 40000 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 78748 | 0.090 |
2 | 65436 | 0.089 |
4 | 302344 | 0.088 |
4 | 322102 | 0.087 |
3 | 371806 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 21430 | 2 |
0.095 | 12600 | 1 |
0.096 | 98635 | 5 |
0.097 | 89032 | 3 |
0.098 | 145000 | 1 |
Last trade - 16.10pm 02/12/2024 (20 minute delay) ? |
Featured News
ASN (ASX) Chart |