The design work of the industrial size pilot plant was started in mid November. The capacity of the plant should be interesting. As will how it will be paid for, with the share price being as it is. I would think the funding would be sorted out by now considering fabrication must be close.
I hope Mg can still be recovered because it is the third most valuable mineral in the brine.
As for Long Canyon maybe the rig at Skyline will do the job? Still no sign of earth works yet.
Also will we have a cr next quarter $2.9m in the bank at the end of last quarter.
AIMO
- Forums
- ASX - By Stock
- Good old fireside chat
The design work of the industrial size pilot plant was started...
-
- There are more pages in this discussion • 885 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $113.7M |
Open | High | Low | Value | Volume |
6.3¢ | 6.5¢ | 6.3¢ | $27.18K | 427.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 182933 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 78748 | 0.090 |
2 | 65436 | 0.089 |
4 | 302344 | 0.088 |
4 | 322102 | 0.087 |
3 | 371806 | 0.086 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 21430 | 2 |
0.095 | 12600 | 1 |
0.096 | 98635 | 5 |
0.097 | 89032 | 3 |
0.098 | 145000 | 1 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
ASN (ASX) Chart |