ASN 0.79% 6.4¢ anson resources limited

Getting back to the delay in drilling. If the delay has been...

  1. 613 Posts.
    lightbulb Created with Sketch. 71
    Getting back to the delay in drilling.
    If the delay has been caused by the shutdown, ASN received the permits 8 days before the shutdown on 22/12/18.
    I know hindsight is a wonderful thing, but they were keen to fast track this drilling.

    BTW …. I sent a message asking if we could be kept informed of the pilot plant progress via twitter but didn't get a reply.
 
watchlist Created with Sketch. Add ASN (ASX) to my watchlist
(20min delay)
Last
6.4¢
Change
0.001(0.79%)
Mkt cap ! $113.7M
Open High Low Value Volume
6.3¢ 6.4¢ 6.1¢ $92.32K 1.484M

Buyers (Bids)

No. Vol. Price($)
2 88102 6.3¢
 

Sellers (Offers)

Price($) Vol. No.
6.4¢ 32557 2
View Market Depth
Last trade - 12.31pm 04/12/2024 (20 minute delay) ?
ASN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.