EXE 0.00% 3.8¢ exoma energy limited

Hi 9 Lives,Don't hold stock but have been watching for a long...

  1. 1,123 Posts.
    lightbulb Created with Sketch. 38
    Hi 9 Lives,

    Don't hold stock but have been watching for a long time.

    I note that the SWQP has been completed and will probably be viewed by EXE as it's gas connection path ?

    SWQP expansion complete

    Tue, 10 January 2012

    Hastings Funds Management Ltd has advised that the expansion of the South West Queensland Pipeline, known as QSN 3, is now complete.

    First gas on the expansion of the South West Queensland Pipeline (SWQP) was contracted to commence on 1 January 2012.

    The SWQP expansion loops the existing 937 km SWQP by building an adjacent pipeline, thereby increasing capacity on the SWQP from 181 TJ/d to approximately 385 TJ/d.

    The SWQP links Queensland’s CSG fields with the QSN Link Pipeline, which connects into the Moomba to Sydney pipeline system and the Moomba to Adelaide Pipeline.

    I also note for the Bureau of Meteorology site that the rainfall reduces to around 10 to 15 mm for the months of July, August and September (historically).

    It looks like the next 2 to 3 months could be good for EXE, drilling results dependent.

    Vx.
 
watchlist Created with Sketch. Add EXE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.