Some good intercepts on the first tow holes, with 8.1 g/t and 7.3 g/t and shallow drilling.
With a minimum cut off of .5 g/t for the entire hole till depth, which means the first two holes a mineralised from the surface.
Looking forward to the next few holes which should be out soon as 5 had beens end to the lab on memory.