"UG access from Giant Pit to Nugent Lodes is now Permitted." Release on 25/05/17
If the Nugent lodes aren't lost to the PHES then there is the need to tunnel into the lode area and undertake a drilling programme to confirm whats there. That shouldn't take long to gear up for. Delivery of ore to the processing plant would be a fair way off but should easily be achievable before the giant pit stockpiles are exhausted.
If the lodes below the pit aren't lost then drilling below the bottom of the pit can start immediately the pit is down to its final depth.
If all the Giant Pit Resources are lost to the PHES then we will run out of stock piles and the plant will sit idle because there is a long lead time in turning the other potential resources into reserves with an approved and permitted mine plan. If Plan B is started quickly the idle time would likely be months rather than years.
- Forums
- ASX - By Stock
- Going underground??
"UG access from Giant Pit to Nugent Lodes is now Permitted." ...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.6¢ |
Change
-0.002(3.45%) |
Mkt cap ! $108.9M |
Open | High | Low | Value | Volume |
5.8¢ | 5.8¢ | 5.5¢ | $178.0K | 3.147M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 260909 | 5.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.6¢ | 799916 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 49767 | 0.080 |
2 | 230000 | 0.079 |
2 | 136415 | 0.078 |
1 | 97825 | 0.077 |
2 | 600000 | 0.075 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 137770 | 2 |
0.084 | 288879 | 3 |
0.085 | 2009000 | 2 |
0.089 | 229500 | 1 |
0.090 | 76002 | 3 |
Last trade - 16.10pm 25/11/2024 (20 minute delay) ? |
Featured News
HGO (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online