Yes, and they plan to build similar mine in James Bay which will be another 50% with Galaxy Resources.
In a sense makes it a 100% owned mine when you add the two 50%.
They plan to duplicate the Mt Cattlin design which took around 12 months or so to construct however at this stage they are in a planning phase at James Bay but currently in production at Mt Cattlin.
Aiming for 200,000 TPA of spodumene at Mt Cattlin which currently is $600 us per tonne but is expected to rise.