-
Share
3,568 Posts.
663
22/05/12
10:52
Share
Fair enough... more drilling will = more oz.
I don't know what CHZ's costs are in Turkey but I know that in Tassie hard rock drilling costs about $180 per meter.
In Ecuador similar work comes in around $100+ per meter.
Thus, 25,000m drilling for CHZ may cost between $2.5 - $4.5m.
What is CHZ's cash positon?
As of the latest Quarterly it was sitting at $4.8m.
Like Loki I will leave this one alone for now.
Cheers
John
-