OIP 0.00% 4.3¢ orion petroleum limited

ggx circulation of materials to shareholders, page-3

  1. 709 Posts.
    lightbulb Created with Sketch. 22
    from 18 Jan:

    openbriefing.com
    Drilling at the first CSG well in PEL 6 at Gwydir-1 (near Narrabri, Northern NSW) was plugged
    and abandoned. Why was this action necessary? Was the well drilled deep enough to
    adequately assess the presence of coal-bearing sediments and general formation quality?
    What further exploration work is planned in PEL 6?
    MD David Casey
    The Gwydir-1 well was a wildcat exploration core hole specifically designed to assess the CSG
    potential of PEL 6. The well was drilled to its planned depth that is to basement, and
    assessed all potential coal bearing horizons. We were delighted with the results from the
    Gwydir -1 corehole. It has confirmed the presence of the Moolayember coal across PEL 6.
    As the Gwydir-1 well was a slim-hole core hole it has no potential in terms of future gas
    production. Accordingly, as is common practice and ultimately a permit requirement the
    well was plugged and abandoned as soon as evaluation work was completed.
    ESG has near-term plans to drill a further two core holes in PEL 6 to further assess the
    Moolayember coal and its potential for CSG production.
 
watchlist Created with Sketch. Add OIP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.