PAX 0.00% 1.2¢ panax geothermal limited

geothermal vs coal in indonesia, page-5

  1. 957 Posts.
    Article 33 of the 1945 Constitution, which stipulates that the state should reap the most benefits from the country’s natural resources, for the welfare of the people, is a powerful enough clause for the Constitutional Court of Indonesia to recently disband BPMigas the state Oil and Gas Regulator and provisionally hand those responsibilities to the gas arm of Pertamina.

    The price disparity between the below projects and Panax's projects that everyone here chooses to conveniently ignore unless they are whooping up the incredible projected rainbow returns would be something that would come under Article 33 scrutiny which Pertamina has just now had very clearly portrayed to them. DrDax would understand what this means.

    Panax is too highly dependent on the standing of Bakrie within the Indonesian system and Bakrie's ability to get PPA's through at such disparaties and we know too little about that atm.

    Old news but what is interesting is Lahendong No.5 expansion is slated for construction during the next 12 months as mentioned on another thread and most interesting is the pegged price of output for two plants mentioned below, article pasted in full so context remains intact.

    PLN to launch 3 geothermal plants in 2012
    Rangga D. Fadillah, The Jakarta Post, Jakarta | Business | Sat, January 07 2012, 2:23 PM
    A- A A+

    State power company PT PLN says it will open three geothermal power plants with a total production capacity of 135 megawatts (MW) this year.

    The plants were identified as the Lahendong Unit 4 plant in North Sulawesi, the Ulubelu Unit 3 and 4 plant in Lampung and the Ulumbu plant in Kupang, East Nusa Tenggara.

    PLN renewable energy chief Muhammad Sofyan said that the Lahendong Unit 4 and Ulumbu plants would start commercial operation in February after completing testing that began in December.

    “The two plants are currently conducting reliability tests for a month so that in February, the plants can begin commercial operation,” Sofyan said on Friday.

    The Ulumbu plant has a capacity of 2x2.5 MW. The geothermal potential at the site is estimated at 10 MW.

    Lahendong Unit 4 has a capacity of 20 MW. The fourth unit will complement three currently operating units in the area, bringing total production at the site to 80 MW. Geothermal development in Lahendong is run by Pertamina Geothermal Energy (PGE). The cost of electricity from the plant has been pegged at 4 US cents per kilowatt-hour (kWh).

    PGE has committed to open two more 20-MW units in Lahendong by 2013. Exploration for a geothermal energy supply for the planned units was underway since 2008, before officials settled on an area in South Lahendong with an estimated potential of 220 MW.

    When construction of the Unit 5 and 6 plant has been complete in 2014, PGE will start construction on Unit 7 and 8. The geothermal energy supply for the plants is expected to come from Kotamobagu, which has a potential of 180 MW.

    In Lampung, the Ulubelu Unit 3 and 4 plant was expected to yield 110 MW, bringing the site’s total production to 220MW, Sofyan said.

    “Unit 3 and 4 is expected to become operational in July or October,” he added.

    The price of electricity from the plant has been pegged at 4 cents per kWh.

    Despite holding 40 percent of the world’s geothermal reserves of around 28,543 megawatts, Indonesia’s geothermal project development has been minimal.

    Although Indonesia began developing geothermal power 30 years ago, the nation currently produces 1,341 MW of geothermal power a year, about 4.6 percent of its potential.

    PLN’s use of renewable energy has been low as of the third quarter of 2011.

    Coal dominated the company’s energy mix at 42.2 percent, followed by oil-based fuels at 23.7 percent, natural gas at 22 percent, hydro at 6.7 percent and renewable energy (including geothermal) at 5.4 percent.

    PLN previously said it wanted to boost geothermal use to 7 percent.

    However, to reduce production costs, the company said it would also boost the use of coal in its energy mix to 51 percent and reduce its use of expensive oil-based fuels to 14 percent.

    Separately, as part of an ongoing national drive to boost economic growth, PT PLN officially inaugurated operations three coal-fired power plantsin December.

    The plants comprise the Banten 1 coal-fired power plant in Suralaya, which has a total capacity of 625 MW, the first unit of the Banten 3 power plant in Lontar, with a total capacity of 3 x 315 MW and the Tanjung Jati B Expansion coal-fired power plant, with a total capacity of 2x662 MW.

    I don't expect any TUs as this is not a rainbow posting aimed at the blinkered rose-tinted sunglasses brigade and most TU are given on the PAX threads for rainbows, not merit, contrary to HC guidelines btw.

    May as well change the name Thumbs UP to Rainbows IMO.

    caveat emptor
 
watchlist Created with Sketch. Add PAX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.