What exactly is the "water release Impact Assessment Report"?
The system will be a closed loop when completed, so the only water release should be overflow from excess rainfall over evaporation. Construction is a different matter - I can see that there might need to be water pumped from one or both reservoirs during construction. Is that what you are referring to?
(Certainly sounds like you have inside knowledge!)
GNX Price at posting:
23.0¢ Sentiment: Hold Disclosure: Held