Yes the bore will need to be cased as it goes down. This process will take 4 weeks IMHO provided nothing goes wrong. Its a 400 meter hole.
RLC in Nevada drilled 1000 meters with Diamond Drill ( took approx 5-6 weeks). I talked with the geologist then why we used the more expensive option. His words in layman terms were, the further you drill down with RC the greater the pressure build up. With Diamond drilling this is not the case and structural integrity of the bore will be there while we case it.
If you want to look at a company where RC drilling was used and failed miserably check out CAD.
(Note not cross promoting just giving comparisins to drilling).
cheers
- Forums
- ASX - By Stock
- General Discussion Banter GLN
Yes the bore will need to be cased as it goes down. This process...
-
-
- There are more pages in this discussion • 1,202 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $60.50M |
Open | High | Low | Value | Volume |
12.5¢ | 12.8¢ | 12.3¢ | $212.1K | 1.694M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 295680 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 2021999 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.115 |
7 | 472031 | 0.110 |
11 | 947628 | 0.105 |
25 | 1490999 | 0.100 |
2 | 20000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 1573785 | 9 |
0.130 | 254710 | 7 |
0.135 | 293280 | 3 |
0.140 | 225541 | 3 |
0.145 | 344396 | 6 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |
The Watchlist
NXD
NEXTED GROUP LIMITED
Nick Poll, Managing Director
Nick Poll
Managing Director
SPONSORED BY The Market Online