Thanks MJ, those were my thoughts on Airacobra-1 anyway so no need to get squeamish lol, Fury-1 is the focus from the two wells drilled under the farm in agreement and from the first announcement they made it clear it was going to be tested under pump for 10 days so no surprises there either considering how Mirage is operated by VPE, if it was going to naturally flow the pump would not have been mentioned.