PIR 0.00% $1.49 papillon resources limited

Still 20000m of results still to come over the coming months...

  1. 3,054 Posts.
    lightbulb Created with Sketch. 13
    Still 20000m of results still to come over the coming months from the 52000m from 2011/2012.(not 90000m as prev posted).

    Two diamond rigs have already started drilling again at Fekola to kick off the 100 000m planed for 2012/2013.

    I can safely say that PIR holders have a big year ahead.
 
watchlist Created with Sketch. Add PIR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.