The existing canning line is small apparently but comment at the AGM stated that a consulting engineer has been engaged to prepare designs for a larger high volume line, this line will need to fit in with existing plant, i suppose this will be a major capex for the site and possibly an additional floor above the bottle line.
GRB Price at posting:
9.9¢ Sentiment: Buy Disclosure: Held