In total 13 diamond holes were drilled as part of the extensional drill program, with the objective of extending the currently defined Cadjebut Splay JORC Inferred Mineral Resource (1.1Mt @ 2.4% Zn, 8.4% Pb and 15.7g/t Ag, above a combined 3% zinc plus lead cut-off) further to the east. The results announced today and the results announced on 20 December, 2010 show that the high grade Cadjebut Splay lead-zinc mineralisation extends a further 550m along the Cadjebut Splay Fault to the east
EXTENDS A FURTHER 550 METRES LONG
HIGHLIGHT THAT
MII Price at posting:
11.3¢ Sentiment: Buy Disclosure: Held