SGL ricegrowers limited

Camden output reaches 16TJ/day Friday, 8 June 2007THE Camden...

Currently unlisted. Proposed listing date: MONDAY, 8 APRIL 2019 11:00AM ##
ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,559 Posts.
    Camden output reaches 16TJ/day


    Friday, 8 June 2007

    THE Camden Joint Venture is producing 16% more gas than this time last year, as it continues rolling out coal seam methane production wells and coreholes, according to partner Sydney Gas.

    Camden drilling operations

    Currently, the JV – in which AGL Energy is also a partner – is dewatering six wells before they are brought on production. The EM 23, 24, 25, 27, 33 and RB08 wells were fracture stimulated between mid and late May.

    As of June 6, the Camden project was producing more than 14 terajoules per day of CSM gas – 16% more than a year ago, Sydney Gas said.

    Chairman John Saunders said the JV was now planning to drill five coreholes to help prove up additional gas reserves in the Stage 3 and 5 areas of the Camden Gas Project.

    "Following the corehole drilling, a reservoir characterisation study will be conducted over the coal seams to determine their gas content, gas composition and gas saturation values for delineating 'high production fairway' with a view to optimise future production drilling locations," Saunders said.

    So far, two coreholes – Currans Hill-1 in the Stage 3 area and Badgerys Creek-1 in Stage 5 – have been drilled and completed after reaching depths of 1069 metres and 955m respectively.

    Having finished drilling Badgerys Creek-1, Rig 28 is scheduled to complete the corehole drilling in the Hunter area at the end of this month and return back to the Camden Gas Project area to complete three additional coreholes.

    Since April 23, the JV has finished drilling one vertical well, EM27 and two deviated wells, EM24 and RB12.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.
Fatal error: Uncaught ErrorException: session_write_close(): Failed to write session data using user defined save handler. (session.save_path: ) in /data/vhosts/test/hotcopper-git/upload/darkhorse/vendor/zendframework/zend-session/src/SessionManager.php:236 Stack trace: #0 [internal function]: Application\Service\AppManager::handlePhpError(2, 'session_write_c...', '/data/vhosts/te...', 236, Array) #1 /data/vhosts/test/hotcopper-git/upload/darkhorse/vendor/zendframework/zend-session/src/SessionManager.php(236): session_write_close() #2 [internal function]: Zend\Session\SessionManager->writeClose() #3 {main} thrown in /data/vhosts/test/hotcopper-git/upload/darkhorse/vendor/zendframework/zend-session/src/SessionManager.php on line 236