OTE 0.00% 0.3¢ otis energy limited

flow rate, page-5

  1. 2,110 Posts.
    10th OF August:

    flow back of fluids expected over the following TWO weeks.

    in comparison:

    6th of September:

    "water will be pumped from the well over a period of two to three weeks."

    Then 12 days later, on 18th of September:

    "Flow back is expected to take several weeks."


    also:

    first time: it took from the start of operation till announcing flow rates exactly two weeks, meaning flow back actually took less than the expected time frame.

    This time: 3 weeks past and no news yet.













 
watchlist Created with Sketch. Add OTE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.