MRX 0.00% 0.7¢ matrix metals limited

in the next 3 months the leach pads will ramp up to capacity of...

  1. 5,391 Posts.
    in the next 3 months the leach pads will ramp up to capacity of 5,500 T CU with a maximum capacity of 10,000 T once Mt Cuthbert and Watson are online.....the mine life is minimum 4 -5 years based on the known resource ......all looks good for the next half decade .....shareprice should be in the 20c range by xmas 07...thats my conservative guess
    cheers jam
 
watchlist Created with Sketch. Add MRX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.