ZAM has low grade Mn ore and the only way they can make a profit out of it is to build the expensive smelter. This is enough to hold them down for years.
With only $4m to bring this high grade mine into production, the trenching and technical review were seen as sufficient for the start up while a drilling will be carried out based on the mining plan.