Open pit exploration target of 500 to 800Mtfor 800mt, at average 32 metre seam, the area required is 15,625,000 sqm or 4km x 4km or 16km2 presentation states:"Recent work has focused ona 50km2 area of the entire590km2 Prospecting Licensearea."
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks