Well by my calculations if they are to hit there target of 3,000,000 mtpa they need a ship that can carry approx 57,000 tonnes per load, that's if it takes one week to load a ship ! Or 2 weeks loading @ approx 115,000 tonnes per ship, does anyone out there know how much the ships they are using can carry, & how long it takes to load the ship ?