CPV 5.88% 24.0¢ clearvue technologies limited

Another problem is that infrastructure such as buildings,...

  1. 2,058 Posts.
    lightbulb Created with Sketch. 62
    Another problem is that infrastructure such as buildings, transport networks and energy generation that is built now to rely on fossil fuels will in effect lock in future emissions for the lifetime in which that infrastructure operates, usually up to 50 years.

    Changing the way we construct infrastructure is therefore essential, but many companies and governments still rely on old measures of economic performance and old ways of generating energy and constructing buildings.

    https://www.theguardian.com/environ...-efforts-climate-change-un-global-warming?CMP
 
watchlist Created with Sketch. Add CPV (ASX) to my watchlist
(20min delay)
Last
24.0¢
Change
-0.015(5.88%)
Mkt cap ! $98.52M
Open High Low Value Volume
25.5¢ 26.0¢ 24.0¢ $120.7K 488.7K

Buyers (Bids)

No. Vol. Price($)
8 45490 24.0¢
 

Sellers (Offers)

Price($) Vol. No.
25.0¢ 6578 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
CPV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.