Another problem is that infrastructure such as buildings, transport networks and energy generation that is built now to rely on fossil fuels will in effect lock in future emissions for the lifetime in which that infrastructure operates, usually up to 50 years.
Changing the way we construct infrastructure is therefore essential, but many companies and governments still rely on old measures of economic performance and old ways of generating energy and constructing buildings.
https://www.theguardian.com/environ...-efforts-climate-change-un-global-warming?CMP
- Forums
- ASX - By Stock
- CPV
- Facing catastrophic climate change
Facing catastrophic climate change
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CPV (ASX) to my watchlist
(20min delay)
|
|||||
Last
24.0¢ |
Change
-0.015(5.88%) |
Mkt cap ! $98.52M |
Open | High | Low | Value | Volume |
25.5¢ | 26.0¢ | 24.0¢ | $120.7K | 488.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 45490 | 24.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.0¢ | 6578 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 11957 | 0.420 |
2 | 20921 | 0.415 |
4 | 123661 | 0.410 |
1 | 2471 | 0.405 |
8 | 40055 | 0.400 |
Price($) | Vol. | No. |
---|---|---|
0.435 | 16870 | 2 |
0.440 | 39572 | 2 |
0.450 | 6157 | 2 |
0.460 | 31026 | 5 |
0.470 | 21978 | 1 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
CPV (ASX) Chart |