the shaded area (still widely open) is currently 4km x 2km
4km x 2km x 3m x SG 2.5 = 60m tonnes
at 40% grade at 45% recovery = 10mt recoverable or 5 year mine life
this, in itself is a game changer
then double that resources & include lower seams and it is a real game changer