Reference the March 2014 Presentation
My interpretation as a layman. Geo may read this an laugh.
Depth to target 2,300m
Deviated well(approx 45 degrees) to get around and under a fault (red line on the seismic & black on the contour map)to get to what looks like updip in anticline (fault and purple line look to be the seals).
From other wells drilled I can recall rate of advance being 200m per day. Allow extra days for casing, cementing,whipstock (and equipment being tested for 1st time..LOL).
20 days may include Drill Stem Testing, so I am of the opinion we will see some news before then. The announcement re spud should include a program (similar to Galoc 11). I would expect this today
NB Strat emailed me to advise that he will be on hols. until the 24th May. He will no doubt be reading but not posting.
- Forums
- ASX - By Stock
- NDO
- extra 10% of barra
extra 10% of barra, page-66
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist