KZL 0.00% 12.0¢ kagara ltd

We have lost everything, mark my words.Dont listen to the...

  1. 2,178 Posts.
    lightbulb Created with Sketch. 27
    We have lost everything, mark my words.
    Dont listen to the posters who are talking of a re float or re start mining, its all crap. Admin almost always means the end for the holders.
 
watchlist Created with Sketch. Add KZL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.