"The treatment plant and transport infrastructure of the Eastern Goldfields provides an excellent opportunity to develop early cash flow with minimal capital outlay from the type of projects that Metaliko has termed Mine Truck and Treat or “MTT” projects. In this context even modest parcels of oxide ore can deliver short term value. Metaliko has two MTT projects at the resource stage, at Goongarrie and Anthill (Figure 6) with a total of 174,000 ounces of gold (refer to the full resource statement released to the ASX 26 May 2011 and summarised here in Table 1). The Company is building additional MTT resources in parallel with its advanced stage exploration activities focused on substantive potentially stand-alone gold discoveries."
MKO Price at posting:
5.0¢ Sentiment: None Disclosure: Held