This 3 July Announcement would seem to indicate a very high grade concentrate can be formed before any downstream processing ie smeltering
"Highlights: • An initial hydrometallurgical test conducted on 1kg of the Ema bulk sample, utilising a simple leach process yields 58.16g/t gold, 442.35 g/t silver, 0.22% copper and 103.40 g/t tin"