I talked to Damien Krebs ( Greenland Minerals ) and he stated that there were some points in the EIA that was submitted that need to be revised/clarified. This is being done now with input from a global company and he anticipates that these revision will be submitted in January and that ML will likely be granted later in the year.The panic and hysteria is probably related to the dis-information and hubris posted by anti-mining groups based on the original EIA draft. I decided to hold my position. It also problematic in that Greenland requires a much more in-depth EIA than most countries and that accounts for much of the delay.