Eagle bay has 5 wells planned for nov/dec but are they contracted to drill via white sands / bounty / dls ? If so does the time frame change till after a proposed/supposed float of white sands drilling...which may be the reason for bounty's temp suspension...or even having to wait for modifications to the drilling equipment to adapt from conditions of norwegian cold to cooper basin swelter. Either stay away for a while till it's more clear what's happening; or tie up your moooneeey waiting for the drills.
- Forums
- ASX - By Stock
- EBR
- eagle bay drilling when ?
eagle bay drilling when ?
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)