EBR 2.20% 93.0¢ ebr systems inc.

re: rained out...... preopen ACN 051 212 429 First Floor, 14...

  1. 25,374 Posts.
    lightbulb Created with Sketch. 2
    re: rained out...... preopen ACN 051 212 429

    First Floor, 14 Outram Street, West Perth WA 6005 Telephone: +61 8 9481 3322
    PO Box 913 West Perth WA 6872 Facsimile: +61 8 9481 3330

    th
    Date: 16 January 2006
    To: Companies Announcements Office, ASX
    Electronic Lodgement:
    Number of pages: 2

    ANNOUNCEMENT TO ASX

    DRILLING RELEASE 6: EMILY#1
    PEL-182, COOPER / EROMANGA BASIN S.A.

    Eagle Bay Resources advises that the Emily-1 oil and gas exploration well is drilling ahead in the Lower
    Hutton Sandstone in 8 ½” hole. A fair oil show was noted in the Primary Objective at the Basal Birkhead/Top
    Hutton? at 1901.5m. This zone warrants testing at Emily-1.

    Rain in the area has closed all roads and prevented the testing equipment arriving at the Emily-1 location in
    time to run a bottom hole drill stem test (DST) over this section as was originally planned. This zone will now
    be evaluated by wireline logs and a possible post logging straddle Drill Stem Test.

    th
    The status of Emily-1 at 06:00 hrs (CST) on 16 January 2006 was:
    Location: PEL-182
    Planned Total Depth: 2364 metres (TVD)
    Current Depth: 2027 metres - in Hutton SS.
    Operation: Drilling ahead in 8 ½” hole.
    th
    Spudded: 23:00 hrs 7 January 2006

    Participants in the Emily-1 well are:
    Eagle Bay Resources (Operator) 37.6%
    Audax Resources Ltd 39.9%
    White Sands Petroleum Ltd 10.0%
    Australian Oil Company No2 P/L 12.5%
    Rig: Century Rig-18
    Target Strata: Hutton SS
    Poolowanna SS
    Tinchoo SS

    Yours sincerely



    ________________

    TONY RECHNER
    DIRECTOR
 
watchlist Created with Sketch. Add EBR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.